Latest articles on Salamandre trunking 
Legrand cable management solution installed at Brighton and Hove Albion's new stadium(12/09/2011)
The Amex Stadium, Brighton & Hove Albion’s new 22,500 capacity stadium, was built with efficiency and economy of operation being key to its long term viability and has become one of the first stadia in the UK to receive a BREEAM ‘very good’ rating. This was achieved through various means, including minimising construction traffic disruption by relocating spoil locally for the remediation and improvement of the adjacent arable fields, minimising CO2 emissions by reducing the quantity of construct... [more]
Electrician from Norwich is the fastest fitter in the land(06/05/2011)
The UK's fast fitter is an electrician from Norwich. Robert Rolfe, who works for J.A Collins Ltd, managed to fit a figure of 5 layout of Legrand's new Salamandre distribution trunking together in a time of just 19.303secs when he attended a road show held at Edmundson Electrical’s Norwich branch on February 17th. Legrand’s Pit Stop road show was a key part of the launch of its new range of Salamandre distribution trunking, which is 50 per cent quicker to install than its predecessor – a stati... [more]
Salamandre trunking installed at Silverstone's new pit and paddock (09/03/2011)
Legrand his supplying its Salamandre distribution trunking for use in the multi million pound Silverstone Wing at the home of the British Grand Prix, Silverstone. The new trunking is being installed throughout the pit and paddock development, which will provide world class facilities, including new garages, a race control building, conference and exhibition space, a new podium, media centre, hospitality and VIP spectator zones. The new product, which was designed following a period of consult... [more]
Legrand's Salamandre Speed Challenge aims to find the fastest fitter in the land(27/01/2011)
Prior to its launch, Legrand’s new range of Salamandre trunking underwent independent tests that prove it is 50 per cent quicker to assemble than its predecessor when fitting length to length or length to fitting – a statistic that considerably reduces its total installed cost. It was designed following a period of consultation with specifiers, installers and engineers that highlighted a desire for a solution that was faster and easier to install, had fewer components, reduced on-site man hou... [more]
Legrand's Salamandre trunking is 50 per cent quicker to install than its predecessor(20/01/2011)
Legrand's new Salamandre trunking has been designed following a period of consultation with specifiers, installers and engineers that highlighted a desire for a solution that was faster and easier to install, had fewer components, reduced on-site man hours and offered improved health and safety. Legrand has launched the new range of Salamandre trunking that independent tests have proven is 50 per cent quicker to install than its predecessor – a statistic that considerably reduces its total i... [more]
Other electrical, lighting, power generation, automation, drives and machine control news
Electrical products and systems:
Cables and cabling -
Circuit protection and electrical distribution -
Lighting and lamps -
Power generation -
Machine and motor control -
Wiring devices -
Electrical installation -
Electrical industry -
Company news -
Product news
Market sectors:
Heating, ventilation, air conditioning, refrigeration -
Home and residential -
Offices and commercial -
Industrial -
Power and utilities -
Security, fire and safety


